Syria PC Project was one of the identical projects which required particular attention to employer requests. After intense qualification of the employer (PETE) Yasan could convince to implement this project. Given to the Syria conditions, the employer required their towers sorted and packed tower wise. In this project, Yasan could supply and ship over 27000 metric tonnes of transmission towers in just 18 months. More than 500 employees engaged and more than 7 new types of towers have been designed and tested successfully.After all, the employer expressed his satisfaction for conducting such important project in certain time (The image of certificate is available in following certificates)